web counter
LEXO PA REKLAMA!

SHKARKO APP

Rama in the Murriz tunnel: Geology problem, patience for the last 100 meters

2023-11-15 13:40:00, Aktualitet CNA
Rama in the Murriz tunnel: Geology problem, patience for the last 100 meters
Edi Rama and Belinda Balluku inspect the works in the Murriz tunnel

Prime Minister Edi Rama has inspected the works in the Murrizi Tunnel, where the work for the completion of this work seems to be moving at a slow pace due to the geological problems that have been encountered on the ground.

" Stopping on the way to Dibër at the Murrizi Tunnel, where the last 100 meters remain, but due to the extremely problematic geology, it moves slowly, making special reinforcements of the structure at each step before placing the final concrete lining of the tunnel.

However, the work advances without stopping, while with patience these 100 meters will be overcome, to make the connection of Dibra with Tirana even easier and faster." - writes Rama on Facebook.

Prime Minister Rama was accompanied in this inspection by the Deputy Prime Minister and at the same time the Minister of Infrastructure Belinda Balluku./ CNA





Lajmet e fundit nga